Berkadia’s Jay Healy Andrew Lanzaro arranged a $15 million loan through HUD’s 232/223(f) program for a California-based sponsor and repeat Berkadia client. The 35-year, non-recourse loan refinanced bank debt that was utilized to pay off the previous HUD loan and fund a new addition for the 99-bed skilled nursing facility located in Bothell, Washington.
The new expansion will include 20 new private rooms, a therapy gym and a dining area. The 99-bed, four-star facility was originally built in 1964 and 1984. At closing, the property had a 56% quality mix.